From foundations to final fit-out, our latest before and after video takes you through the delivery of Merrion Street,
Leeds for long-standing client Scape.
🏗️ 32-storey tower + 10-storey lower block
🎓 660 student rooms across studios and clusters
🎬 Cinema, gym and communal spaces at ground floor
🌉 Glass link bridge connecting atrium to reception
♻️ Air source heat pumps and in-house off-site bathroom pods
A logistically challenging city-centre site, delivered through our self-delivery model, giving us direct control over programme, quality and mobilisation from day one.
Another scheme delivered in the North, and another step in our growing national footprint.
Practical Completion September 2024.
https://vimeo.com/1224871030?share=copy&fl=sv&fe=ci