Collaboration underpins our successful project delivery.

Through early engagement with our clients and the involvement of design teams and the supply chain, we gain a comprehensive understanding of your visions and how these can be best brought to life. A collaborative approach based on value engineering, buildability reviews and de-risking ensures optimum, high quality solutions for our clients, on time and on budget.

IN-HOUSE CAPABILITIES

Our exceptional self-delivery capabilities mean we have much greater control over project cost, quality and programme. HG Offsite Solutions manufactures bespoke bathroom pods and utility cupboards, and HG M&E provides a full mechanical and electrical service on many of our schemes. We also deliver cranes, concrete frames and piling on our client projects, mitigating the risk of external third parties and generating significant advantages for our clients.

1/6

CRANES

Tower cranes are pivotal to the speed and flow of the build programme. HG has invested in its own fleet of 31 tower cranes, enabling rapid mobilisation and complete control of programme.

100%

of Cranes on our projects

2/6

PILING

Investing into a leading piling business means we can utilise specialist design expertise to swiftly mobilise and engage with our construction teams from the earliest stages.

80%

of Piling on our projects

3/6

M&E

Our ability to provide in-house Mechanical and Electrical (M&E) services makes us a complete provider from design to installation, handover and aftercare.

40%

of M&E on our projects

4/6

CONCRETE FRAMES

Our in-house concrete frame business ensures greater timing, sequencing and phasing as part of the project delivery timeline, enabling a complete build programme approach.

40%

of Frames on our projects

5/6

utility pods

100% of our utility pods are manufactured in-house, offering a sustainable solution with significant programme savings.

100%

of Utility Pods on our projects

6/6

BATHROOM PODS

Our high quality bathroom pods deliver substantial environmental benefits as well as programme and cost certainty for our clients.

100%

of Bathroom Pods on our projects

We generate significant cost and programme certainty and efficiencies for our clients.

Workspace plc have collaborated with HG Construction on projects with a cumulative cost in excess of £100m.
We have an excellent relationship with HG’s people at all levels of the organisation and have found their “can do” attitude positively contributes to the success of each contract.

Angus Boag

Development Director, Workspace

INNOVATION

At HG we combine expertise and long-standing experience with a modern, innovative approach. We embrace both traditional and modern methods of construction, tailoring the best solutions for each project. Ongoing corporate investment into digital design (BIM), forward-thinking construction technologies and methodologies means we can achieve exceptional levels of quality with reduced programmes and process waste, delivering energy efficiency and sustainability during construction and throughout the lifetime of the building.

We embrace both traditional and modern methods of construction, developing bespoke solutions for each project.


DELIVERING RESPONSIBLY

01
Health, Safety & Welfare

Driving a Zero Harm Policy across the company, the culture of HG is health and safety excellence, achieved through investment, training and a collaborative team approach to protecting all affected by our works, both physically and mentally. Our dedicated in-house team of HSEQ professionals ensures delivery under our ISO 45001 Health & Safety Management System and keeps us abreast of legislation, training requirements and best working practice. Our sites utilise Buildsafe to measure performance and drive continuous improvement across the business, sharing both best practice and lessons learned across our teams and supply chain partners.

the culture of HG is health and safety excellence

SAFETY BY CHOICE, NOT BY CHANCE

This is our front-of-mind campaign to collectively empower all of our people, sub-contractors and stakeholders to work together as one 'safety first' team, considering risk and reviewing all aspects of the way we do things, so that we can make continuous improvements.

02
environmental

Accredited to the ISO 14001 Standard and working towards Planetmark, HG is an environmentally-conscientious and responsible company. Our environmental strategy embraces zero waste, sustainable procurement, carbon reduction and biodiversity, and is strongly aligned with our commitment to being an active steward of the natural environment. We are working towards being carbon net neutral for scope 1 and 2 carbon emissions by 2030.

Working collaboratively with our supply chain partners, we procure ethically and sustainably with a major focus on localism across our schemes. We embrace and encourage Modern Methods of Construction such as off-site manufacturing solutions to generate significantly less waste and environmental impact in delivery and far more energy efficient, lower carbon buildings.

We are working towards becoming a carbon net neutral business by 2030.

03
Quality

HG’s ISO 9001 Integrated Management System sets the benchmark for all our processes, ensuring high standards from project inception through to post completion aftercare, review and lessons learned. Our culture of zero defects and soft landings are key drivers with early stage and an ongoing collaborative team effort to ensure quality, design, value engineering and buildability. This integrated HG, client, design and supply chain approach leads to realistic and best value solutions with each HG scheme delivered to high standards, sustainably and fit-for-purpose, with end-users, maintenance and running costs considered from the start.

Our culture of zero defects is based on an ongoing collaborative effort...

ACCREDITATIONS